ITcon papers tagged with: crew allocation system

2010 Al-Bazi A F, Dawood N, Dean J T
Improving performance and the reliability of off-site pre-cast concrete production operations using simulation optimisation
ITcon Vol. 15, pg. 335-336, http://www.itcon.org/2010/25